Sample quotes · not a live placement

Harborline Distribution

212,400 sf warehouse · Bayport, Harris County, TX · built 1987

TIV $74.4M · building $48.2M · BPP $9.4M · BI $16.8M

Three carrier quotes

Carrier A

Admitted · named peril · $186,400

  • Building$42.0M
  • AOP, wind$25k · 2%
  • Flood · quake · cyberExcluded

Carrier B

Surplus · special form · $241,900

  • Building$52.0M
  • AOP, wind$50k · 5%
  • Flood · cyber$2.5M · $1.0M

Carrier C

Admitted · special form · $214,750

  • Building$48.2M
  • AOP, wind$100k · 2%
  • Quake · flood$5.0M · excluded

Conflicts and gaps

Premium order is A, then C, then B. That order hides a $6.2M building hole on A and a 5% wind deductible on B.

Field compare

Building limit

A
$42.0M $6.2M under TIV
B
$52.0M
C
$48.2M matches TIV

Form

A
Named peril basic perils only
B
Special form (all risk)
C
Special form (all risk)

AOP deductible

A
$25,000
B
$50,000
C
$100,000

Wind and hail

A
2% of building plus BPP · $1.15M
B
5% of building plus BPP · $2.88M $1.73M above A and C
C
2% of building plus BPP · $1.15M

Flood

A
Excluded no flood
B
$2.5M sublimit token vs TIV
C
Excluded NFIP residual only

Earthquake

A
Excluded
B
Excluded
C
$5.0M

Cyber

A
Excluded
B
$1.0M first party
C
Excluded

Business interruption

A
$12.0M · 12 months · 72-hour wait $4.8M under TIV
B
$18.0M · 18 months · extra expense · 24-hour wait
C
$16.8M · 12 months · 72-hour wait matches TIV

Ordinance or law

A
Excluded no code upgrade
B
Coverage A and B · $1.0M
C
Coverage A only undamaged portion only

Soft costs

A
Excluded
B
$250,000
C
Excluded

Talk-track

Open the compare, not the premiums. A is cheapest because it is $6.2M short on the building and named peril. Raise the holes that survive a Houston wind or flood year. Leave Harris County quake for the lender if they asked.